Client Within the Construction Sector
Project Example
Alternative Roof Access System Using Climbing Equipment Due to Scaffold Constraints
The commercial facing project began in July 2020 with pre-commencement tasks, and concluded June 2022 with final handover to the customer. The R&D activities detailed in the claims made by the company fall within these time periods and appropriate apportionments have been made to ensure that a conservative estimate of project time has been allocated to the claim in line with Ss.33-34 DSIT Guidelines.
The areas of the roof where access was required would normally be carried out by a ‘bird cage’ scaffold access platform. This was indeed in place for part of the work however, due to material shortages, the safe scaffold access had to be removed to permit sequenced work to progress. Accordingly, alternative methods of safe access which allowed works below the work area had to be considered. This is the key difference in methods, and the adoption of ‘climbing’ equipment was borne from considerations regarding safe access to the work area while maintaining adequate progress below of other work elements, and allow relatively free movement in the roof itself.
Hybrid Raft-Strip Foundation System for Construction on Weak Load-Bearing Ground
The company sought to develop a novel and structurally stable foundation solution for use on weakened load bearing soil. The solution itself was a hybrid between two existing foundation concepts; raft and strip foundations, as the company determined that existing foundation solutions were not feasible. For example, a traditional strip foundation would be around 600mm wide and 1m deep. This wouldn’t have worked as the foundation was required to sit on unstable ground and would not have sufficiently supported the building. Piled foundations were another potential solution, and this solution was deemed inviable for similar reasons; being that piled foundations would rely on the unstable ground for stability.
Finally a standard raft foundation solution was considered, which was also inviable due to the loadings imparted by the specified structure. The hybrid foundation subsequently developed was a 2m wide strip foundation, utilising the load bearing capacity of a strip foundation as well as the load distribution capability of raft foundations. As an untested and new application of foundation design, it was important for the company to follow proper procedure and to fully test the product alongside calculations to ensure that the technology functioned properly. To the company’s knowledge, this blend of foundation types had never been attempted and therefore the development of a low penetration strip foundation solution was entirely novel for the industry and provides adequate precedent for undertaking large construction projects on poor ground conditions where there were limited cost efficient solutions available on the market.
Get in Touch With One of Our Experts
In the 2023–24 tax year alone, UK businesses claimed £7.6 billion in R&D tax relief across 46,950 claims. If your business is investing in innovation, you could be eligible too.
Book a free consultation with our team and we’ll help you uncover qualifying activities, identify eligible costs, and understand how much you could claim.